Farmhouse electrical system upgrade

Summary of work carried out

  • Design
  • Cabling
  • Earthing system installation and excavation work
  • Socket outlets and installation of power equipment installation
  • Panel work — indoor and outdoor boards
  • Luminaire installation
  • Testing — protective device operation, RCD testing, insulation resistance, earth electrode resistance.

Condition of the boards beforehand

After installation